Electricity generation and consumption, network losses, renewable sources, reliability of supply.

Declining water flows, irregular precipitation and extreme temperatures threaten the reliability of hydropower generation and the country’s energy security.

Indicators
18
Official
11
Combinations
8
No data
3

Electricity generation

VII.16
23,990 million kWh
+3,390 vs 2021
Official 2025

Share of renewables in electricity generation

VII.11
92.6 %
+2.6 vs 2021
Official 2025

Strategic documents

Targets

  • Reducing losses in transmission networks by 3% and in distribution networks by 9%
  • Increasing installed capacity and diversification through renewable energy sources
  • Electricity exports to neighbouring countries

Trend combinations from the report: panels share a year axis, each with its own scale. “Index = 100” mode rebases series to the first year on a single scale. Hollow markers indicate unofficial data.

VII-2 Simple chart

Uninterrupted electricity supply, generation and renewable energy sources

Source: Form No. 1-IK (MEWR); unofficial: open sources, test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Shows the degree of adaptation of regional power supply systems to the risks of supply interruptions and the involvement of the renewable energy sector, including local sources.

VII-3 Simple chart

Electricity generation and reservoir siltation

Source: Form No. 1-IK (MEWR); unofficial: open sources, test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

A widening gap between the trends in electricity generation and reservoir siltation indicates a high degree of adaptation of the electricity generation system.

VII-4 Simple chart

GDP growth and primary energy

Source: Form No. 1-IK (Agency on Statistics, MEWR); unofficial: open sources, test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Makes it possible to assess the extent to which GDP growth is backed by growth in primary energy, which is important for diversifying sources, including through renewable energy sources.

The report specifies “primary energy production, million kWh”; in the form, the indicator is kept in ktoe.

VII-5 Simple chart

Uninterrupted electricity supply, network losses and small HPPs

Source: Form No. 1-IK (MEWR, Agency on Statistics); unofficial: test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Assesses the effectiveness of measures to reduce losses in power transmission lines and to commission small hydropower plants; useful at the regional level for selecting priority facilities.

VII-6 Simple chart

Energy consumption and temperature regime

Source: Form No. 1-IK (Hydromet Agency, CEP); unofficial: test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Makes it possible to assess the energy efficiency of adaptation measures.

VII-7 Simple chart

Water stress and glacier mass balance

Source: Form No. 1-IK (MEWR, Land Reclamation and Irrigation Agency); unofficial: test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Determines whether water stress is commensurate with current and future water reserves in glaciers.

Same as combination II-6.

VII-8 Simple chart

Water stress and natural population increase

Source: Form No. 1-IK (MEWR, Land Reclamation and Irrigation Agency); unofficial: test dataUpdated: 18.10.2026 · form of 01.09.2026

Rationale for the combination

Provides information on meeting the population’s growing demand for water.

Same as combination II-7.

Code Indicator Latest value Source 2021–2025 vs previous year Responsible agency
Drivers 2
Impacts 7
Vulnerability 1
Mitigation 4
Adaptation 4
AgencyIndicatorsWith official valueCoverageIndicator codes
MEWR 14 8 VII.1 VII.3 VII.4 VII.5 VII.6 VII.7 VII.8 VII.10 VII.11 VII.12 VII.15 VII.16 VII.17 VII.18
Agency on Statistics 6 5 VII.1 VII.2 VII.3 VII.5 VII.9 VII.13
Barqi Tojik OSHC 3 0 VII.4 VII.6 VII.7
Distribution Networks OJSC 1 0 VII.5
Hydromet Agency 1 1 VII.8
Ministry of Finance 1 0 VII.14
Tax Committee 1 0 VII.14

If several agencies are listed as responsible, the indicator is counted for each. According to the Guidelines, the first agency listed is responsible for entering the value.